The Big Easy is a New Generation rig, designed specifically to meet the demanding challenges of today’s highly competitive rig contracting market. The Mast and Substructure are optimized for highly mobile land drilling operations, to be assembled quickly and easily, without the need of a crane on site. No conventional rig design or rig packaging concepts were left unchallenged in order to meet the objective of developing the most efficiently mobilized and erected rig on the market. It is comprised of a single mast package, and a three-piece substructure, transported on heavy duty dollies, with three steerable axles and three fixed axles—specifically engineered for optimum weight distribution, minimal turning radius, alignment of assemblies, and heavy-duty off-road operations.
Mast/Substructure packaging philosophy, and moving equipment integration results in comfortable (legal/permitable) over-the-road loads and dimensions with minimal components.
The dolly, with three steerable axles and three fixed axles, is specifically engineered for optimum weight distribution, minimal turning radius, alignment of assemblies, and heavy-duty off-road operations. The dollies have a self steering ability for normal travel, and hydraulic steering for difficult intersections or on-site maneuvers. For ease of alignment during installation, the mast support system includes hydraulic lifting and translation capabilities at the dolly as well as at the kingpin.
Dolly Steering
Running Gear
Special Features for Easy Loading
Unique Substructure design allows well to well access along a well row, clearing existing well heads, with mast assembly and raising perpendicular to the row of wells, clear of adjacent walls. (Skidding or walking system optional)
Nudging loads with trucks, struggling with come-a-longs, and swinging large hammers to bring substructure braces into alignment and pinning are a thing of the past with Easy Brace. Easy Brace also serves other rig assembly functions such as: